PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Tokyu Land Corporation

東急不動産株式会社

Offtaker:

Kasukabe City

春日部

Industry:

Municipality

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

1.85MW (DC)

Inverter:

1.85MW (AC)

Generation:

Status and timeline

Status:

Partially live

*

Disclosed:

July 17, 2024

COD:

Gradually between FY2024 and FY2028 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Tokyu Fudosan will install solar power plants at 20 facilities owned by Kasukabe City in Saitama Prefecture, as well as 200kWh of storage batteris
  • The PPA is expected to result in 734t per year CO2 emission reduction

Tokyu Land Corporation's other PPAs

Kasukabe City's other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.