PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

JA Mitsui Energy Solutions

JA三井エナジーソリューションズ株式会社

Offtaker:

Senko Co., Ltd.

センコー株式会社

Industry:

Logistics

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

0.64992MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

Disclosed:

July 26, 2024

COD:

June 28, 2024

Duration:

Undisclosed

Additional details

  • JA Mitsui Energy Solutions developed a rooftop solar power plant at Senko Keiyo PD Center in Ichihara City, Chiba Prefecture
  • The solar panels are co-located with a 193.5 kWh battery storage system, a first for the company
  • The solar panels by themselves cover approximately 50% of the center’s daytime consumption
  • A third of the generated renewable energy credits will be used at the center itself while the remaining two thirds will be assigned to Shiomi SIF Building in Koto Ward, Tokyo

Image(s)

JA Mitsui Energy Solutions's other PPAs

Senko Co., Ltd.'s other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.