PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Miyazaki-ken Nokyo Kajyu Co., Ltd.

宮崎県農協果汁株式会社

Industry:

F&B Manufacturing

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

0.500825MW (DC)

Inverter:

-

Generation:

0.59GWh/year

Status and timeline

Status:

Live

Disclosed:

August 20, 2024

COD:

2024/08

Duration:

20

Additional details

  • TESS Engineering developed a rooftop solar power plant at Miyazaki-ken Nokyo Kajyu’s HQ/factory
  • The power plant uses 871 575W Trina Solar panels
  • The PPA is expected to account for approximately 2.6% of the factory’s consumption and result in 254t per year CO2 emission reduction

Image(s)

TESS Engineering Co., Ltd.'s other PPAs

Miyazaki-ken Nokyo Kajyu Co., Ltd.'s other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.