PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

TOPPAN Inc.

TOPPAN株式会社

Industry:

Printing

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

0.55224MW (DC)

Inverter:

-

Generation:

0.65GWh/year

Status and timeline

Status:

Live

Disclosed:

August 29, 2024

COD:

2024/06

Duration:

20

Additional details

  • TESS Engineering developed a rooftop solar power plant at TOPPAN’s Takino Factory in Kato City, Hyogo Prefecture
  • The power plant uses 936 590W Toyo Aluminum panels
  • The PPA is expected to account for approximately 1.4% of the factory’s consumption and lead to 277t-CO2 per year emission reduction