PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Suminoe Development SPC

住之江デベロップメント特定目的会社

Industry:

Real Estate

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

0.7935MW (DC)

Inverter:

-

Generation:

0.91GWh/year

Status and timeline

Status:

Upcoming

Disclosed:

September 26, 2024

COD:

2025/04 (expected)

Duration:

20

Additional details

  • TESS Engineering will develop a solar power plant at Logicross Osaka Suminoe, a logistics facility owned by Mitsubishi Estate’s wholly-owned SPC Suminoe Development
  • 1,380 575W Toyo Aluminum panels will be used
  • The PPA is expected to lead to 391t-CO2 annual emission reduction

Image(s)

TESS Engineering Co., Ltd.'s other PPAs

Suminoe Development SPC's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.