PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Kracie Co., Ltd.

クラシエ株式会社

Industry:

F&B Manufacturing

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

0.101244MW (DC)

Inverter:

-

Generation:

0.101GWh/year

Status and timeline

Status:

Upcoming

Disclosed:

October 28, 2024

COD:

2025/08 (expected)

Duration:

20

Additional details

  • TESS Engineering will develop a rooftop solar power plant at Kracie’s Kyoto Factory
  • The power plant is expected to generate 1.13GWh per year, of which 1.01GWh will be used at the factory (approximately 29.2% of consumption) and 120MWh will be sold by TESS Engineering into the wholesale power market and subsidized through the FIP scheme
  • The power plant will consist of 1,716 590W Jinko Solar panels

TESS Engineering Co., Ltd.'s other PPAs