PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Nishitetsu Shizen Energy Co., Ltd.

西鉄自然電力合同会社

Offtaker:

Nishi-Nippon Railway Co., Ltd.

西日本鉄道株式会社

Industry:

Railway

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

0.117MW (DC)

Inverter:

-

Generation:

0.149559GWh/year

Status and timeline

Status:

Upcoming

Disclosed:

November 15, 2024

COD:

FY2024 (expected)

Duration:

20

Additional details

  • Nishitetsu Shizen will install a solar power plant together with a 159kWh battery system at Nishi-Nippon Railroad’s Narita Logistics Center in Shibayama Town, Chiba Prefecture

Nishitetsu Shizen Energy Co., Ltd.'s other PPAs

Nishi-Nippon Railway Co., Ltd.'s other PPAs