PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Nishitetsu Shizen Energy Co., Ltd.

西鉄自然電力合同会社

Offtaker:

Nishi-Nippon Railway Co., Ltd.

西日本鉄道株式会社

Industry:

Railway

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

0.173MW (DC)

Inverter:

-

Generation:

0.330772GWh/year

Status and timeline

Status:

Live

Disclosed:

November 15, 2024

COD:

2024/09/01

Duration:

20

Additional details

  • Nishitetsu Shizen installed a solar power plant together with a 16.4kWh battery system at Nishi-Nippon Railroad’s Rinku Logistics Center in Izumisano City, Osaka Prefecture

Nishitetsu Shizen Energy Co., Ltd.'s other PPAs

Nishi-Nippon Railway Co., Ltd.'s other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.