PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Tokyu Land Corporation

東急不動産株式会社

Retailer:

ReENE Co., Ltd.

株式会社リエネ

Offtaker:

Yasuda Logistics Corporation

安田倉庫株式会社

Industry:

-

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

-

Inverter:

-

Generation:

0.303105GWh/year

Status and timeline

Status:

Live

Disclosed:

November 25, 2024

COD:

2024/11/01

Duration:

Undisclosed

Additional details

  • ReENE started supplying power generated at ReENE Katori Solar Power Plant in Katori City, Chiba Prefecture, to Yasda Logistics Shibaura Branch in Tokyo
  • The PPA is expected to lead to 145t-CO2 per year emission reduction

Tokyu Land Corporation's other PPAs

Yasuda Logistics Corporation's other PPAs