PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Colletochi Co., Ltd.

株式会社コレトチ

Offtaker:

JTEKT FINETECH Co., Ltd.

株式会社ジェイテクトファインテック

Industry:

-

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

0.363MW (DC)

Inverter:

-

Generation:

0.36GWh/year

Status and timeline

Status:

Live

Disclosed:

November 26, 2024

COD:

2024/11/26

Duration:

Undisclosed

Additional details

  • Colletochi developed a solar power plant at JTEKT FINETECH’s Kiyohara Factory in Utsunomiya City, Tochigi Prefecture
  • The PPA is expected to result in 142t-CO2/year emission reduction