PPA overview

Contract model and parties

Model:

Virtual

Generator:

JERA Co., Inc.

株式会社JERA

Retailer:

JERA Cross Inc.

株式会社JERA Cross

Offtaker:

Tokyo Metro Co., Ltd.

東京地下鉄株式会社

Industry:

Railway

Capacity and generation

T&D area:

-

Technology:

Solar

Capacity:

1.2MW (DC)

Inverter:

-

Generation:

2.4GWh/year

Status and timeline

Status:

Live

*

Disclosed:

November 26, 2024

COD:

2024/12 (expected)

Duration:

25

* Presumed live based on the expected COD.

Additional details

  • Tokyo Metro will buy renewable energy certificates from JERA’s solar power plant through JERA Cross; the generated power will be sold into the wholesale market and Tokyo Metro will buy power from its retailer