PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Minami Nihon Rakunokyodo Co., Ltd.

南日本酪農協同株式会社

Industry:

F&B Manufacturing

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

0.957MW (DC)

Inverter:

-

Generation:

1.17GWh/year

Status and timeline

Status:

Live

Disclosed:

December 24, 2024

COD:

2025/02

Duration:

20

Additional details

  • TESS Engineering installed 1,134 625W and 420 590W Jinko Solar panels on the rooftop of and on empty land around Miyakonojo Factory in Miyakonojo City, Miyazaki Prefecture
  • The PPA is expected to lead to approximately 502t-CO2/year emission reduction

TESS Engineering Co., Ltd.'s other PPAs

Minami Nihon Rakunokyodo Co., Ltd.'s other PPAs