PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Gunma Prefecture

群馬県

Retailer:

TG Octopus Energy Co., Ltd.

TGオクトパスエナジー株式会社

Offtaker:

Multiple

複数

Industry:

-

Capacity and generation

T&D area:

Tokyo

Technology:

Hydro

Capacity:

24.47MW (DC)

Inverter:

-

Generation:

87.986GWh/year

Status and timeline

Status:

Upcoming

Disclosed:

January 16, 2025

COD:

2025/04 (expected)

Duration:

3

Additional details

  • Power from Momono Power Plant (6.2MW), Hinatami Power Plant (1MW), Taguchi Power Plant (6MW), Shimokubo No. 2 Power Plant (270kW), and Souri Power Plant (11MW) will be supplied to 17 businesses in Gunma Prefecture including Baisia
  • Most of the locations requiring 1GWh to 3GWh per year except for one in Ota City, which is expected to require 60GWh per year

Gunma Prefecture's other PPAs

Multiple's other PPAs

Monthly Report - The Japanese Power Industry Executive