Chubu Electric Power Miraiz installed 840kW of ground-mounted solar on the site of the former sports ground at ADEKA Mie Factory in Toin Town, Mie Prefecture, alongside 30kW of solar card ports
The former is expected to generate 1GWh/year and the latter 36MWh/year
The two are expected to account for approximately 6% of the factory’s consumption
The PPA is expected to lead to 475t-CO2 emission reduction
Image(s)
Chubu Electric Power Miraiz's other PPAs
Disclosed
Offtaker
Model
MW DC
ADEKA Co., Ltd.'s other PPAs
Start typing and press enter to search
Submit the form below to receive a sample issue of The Japan Power Industry Executive.