PPA overview

Contract model and parties

Model:

Virtual

Generator:

NTT Anode Energy Corporation

NTTアノードエナジー株式会社

Offtaker:

Duskin Co., Ltd.

株式会社ダスキン

Industry:

-

Capacity and generation

T&D area:

-

Technology:

Solar

Capacity:

4.8MW (DC)

Inverter:

-

Generation:

5.5GWh/year

Status and timeline

Status:

Live

*

Disclosed:

January 28, 2025

COD:

2025/02/01

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • NTT Anode Energy will supply non-fossil certificates generated at newly developed solar power plant(s) in Yamaguchi Prefecture to Duskin, which will use it at its subsidiaries:
    • Ono Duskin, which runs a doormat plant in Ono City, Hyogo Prefecture
    • Wakura Duskin, which runs a mop plant in Nanao City, Ishikawa Prefecture
  • The PPA is expected to cover the two plants’ consumption

NTT Anode Energy Corporation's other PPAs

Duskin Co., Ltd.'s other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.