PPA overview

Contract model and parties

Model:

Virtual

Generator:

NTT Anode Energy Corporation

NTTアノードエナジー株式会社

Offtaker:

Duskin Co., Ltd.

株式会社ダスキン

Industry:

-

Capacity and generation

T&D area:

-

Technology:

Solar

Capacity:

4.8MW (DC)

Inverter:

-

Generation:

5.5GWh/year

Status and timeline

Status:

Live

*

Disclosed:

January 28, 2025

COD:

2025/02/01

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • NTT Anode Energy will supply non-fossil certificates generated at newly developed solar power plant(s) in Yamaguchi Prefecture to Duskin, which will use it at its subsidiaries:
    • Ono Duskin, which runs a doormat plant in Ono City, Hyogo Prefecture
    • Wakura Duskin, which runs a mop plant in Nanao City, Ishikawa Prefecture
  • The PPA is expected to cover the two plants’ consumption

NTT Anode Energy Corporation's other PPAs

Duskin Co., Ltd.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.