PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Kyudenko Corporation

株式会社九電工

Offtaker:

Japan Aerospace Exploration Agency

国立研究開発法人宇宙航空研究開発機構

Industry:

-

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

0.76MW (DC)

Inverter:

0.63MW (AC)

Generation:

Status and timeline

Status:

Live

Disclosed:

January 30, 2025

COD:

2025/01/01

Duration:

20

Additional details

  • Kyudenko built a ground-mounted solar power plant on empty land at JAXA’s Tanegashima Space Center in Minamitane Town, Kagoshima Prefecture
  • This is Kyudenko’s first on-site PPA

Image(s)

Kyudenko Corporation's other PPAs

Japan Aerospace Exploration Agency's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.