Model:
Physical (on-site)
Generator:
Kyudenko Corporation
株式会社九電工
Offtaker:
Japan Aerospace Exploration Agency
国立研究開発法人宇宙航空研究開発機構
Industry:
-
T&D area:
Kyushu
Technology:
Solar
Capacity:
0.76MW (DC)
Inverter:
0.63MW (AC)
Generation:
Status:
Live
Disclosed:
January 30, 2025
COD:
2025/01/01
Duration:
20