PPA overview

Contract model and parties

Model:

Physical (hybrid on-/off-site)

Generator:

Undisclosed

未公開

Retailer:

Clean Energy Laboratory Inc.

クリーンエネルギー研究所合同会社

Offtaker:

Bic Camera Inc.

株式会社ビックカメラ

Industry:

Retail

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

-

Inverter:

-

Generation:

Status and timeline

Status:

Live

Disclosed:

January 31, 2025

COD:

2022/12 (on) and 2025/02/01 (off)

Duration:

Undisclosed

Additional details

  • In Dec. 2022, Bic Camera added an on-site PPA at its Higashimatsuyama Center (Higashimatsuyama City, Saitama Prefecture) logistics facility’s old building, which has been supplying approximately 22% of the center’s power and led to approximately 430t-CO2 emission reduction
  • Solar panels were installed at the center’s new building too; the generated power is being supplied to Bic Camera Ikebukuro Store in Toshima City, Tokyo; it accounts for 100% of the store’s annual consumption and is expected to cut emissions by approximately 861t-CO2

Image(s)

Undisclosed's other PPAs

Bic Camera Inc.'s other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.