PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

TOPPAN Inc.

TOPPAN株式会社

Industry:

Printing

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

0.645MW (DC)

Inverter:

-

Generation:

0.78GWh/year

Status and timeline

Status:

Live

Disclosed:

March 17, 2025

COD:

2025/02

Duration:

20

Additional details

  • TESS Engineering installed 1,122 575W Toyo Aluminum panels at TOPPAN’s Sakado Factory in Sakado City, Saitama Prefecture
  • The PPA is expected to lead to 329t-CO2/year emission reduction

Image(s)

TESS Engineering Co., Ltd.'s other PPAs

TOPPAN Inc.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.