PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Chugoku Electric Power Co. ,Inc

中国電力株式会社

Offtaker:

Eidai Co., Ltd.

永大産業株式会社

Industry:

Construction

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

0.233MW (DC)

Inverter:

-

Generation:

0.259624GWh/year

Status and timeline

Status:

Live

Disclosed:

March 21, 2025

COD:

2025

Duration:

20

Additional details

  • Chugoku EPCO built a solar power plant at Eidai’s Yamaguchi-Hirao Office
  • The PPA is expected to reduce the facility’s CO2-related emissions by 2.2% (135t/year)