PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Undisclosed

未公開

Offtaker:

Fancl Biken Co., Ltd.

株式会社ファンケル美健

Industry:

Consumer Products

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

-

Inverter:

-

Generation:

0.375GWh/year

Status and timeline

Status:

Live

*

Disclosed:

March 26, 2025

COD:

2025/04/01 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • An undisclosed generator built a solar power plant at Fancl Biken’s Shiga Factory in Hino Town, Shiga Prefecture
  • This is the first PPA at a Fancl factory
  • In 2011, a solar power plant for self-consumption was built at the factory, accounting for 16% of its consumption; with this PPA, on-site consumption will increase to about 50% (1.5GWh/year) of total

Image(s)

Undisclosed's other PPAs

Fancl Biken Co., Ltd.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.