PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Ariake Farm Co., Ltd.

アリアケファーム株式会社

Industry:

Agriculture

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

0.365MW (DC)

Inverter:

-

Generation:

0.43GWh/year

Status and timeline

Status:

Live

Disclosed:

April 14, 2025

COD:

2025/04

Duration:

20

Additional details

  • TESS Engineering installed 624 585W Jinko Solar panels at Ariake Farm’s Isahaya Bay Reclamation Branch in Isahaya City, Nagasaki Prefecture
  • The PPA is expected to account for about 42% of the facility’s power consumption; excess power will be sold under the FIP scheme

Image(s)

TESS Engineering Co., Ltd.'s other PPAs

Ariake Farm Co., Ltd.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.