PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Chubu Electric Power Co.,Inc.

中部電力株式会社

Retailer:

Chubu Electric Power Miraiz

中部電力ミライズ株式会社

Offtaker:

Fujita Academy Incorporated Educational Institution

学校法人藤田学園

Industry:

Education

Capacity and generation

T&D area:

Chubu

Technology:

Solar

Capacity:

2.3MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Upcoming

Disclosed:

April 15, 2025

COD:

2025/06 (expected)

Duration:

Undisclosed

Additional details

  • Chubu Electric Power Miraiz will supply Fujita Health University and its hospital with power generated at a 2.3MWDC floating solar power plant built on an adjacent agricultural reservoir by Chubu EPCO and connected via private line

Image(s)

Chubu Electric Power Co.,Inc.'s other PPAs

Fujita Academy Incorporated Educational Institution's other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.