PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Toyo Seikan Co., Ltd.

東洋製罐株式会社

Industry:

Material Manufacturing

Capacity and generation

T&D area:

Chubu

Technology:

Solar

Capacity:

1.5576MW (DC)

Inverter:

-

Generation:

1.919GWh/year

Status and timeline

Status:

Live

Disclosed:

April 18, 2025

COD:

2025/03

Duration:

20

Additional details

  • TESS Engineering built a solar power plant consisting of 2,640 590W Jinko Solar panels at Toyo Seikan’s Shizuoka Factory in Makinohara City, Shizuoka Prefecture
  • It also installed three 4.95kW/15kWh Huawei batteries

Image(s)

TESS Engineering Co., Ltd.'s other PPAs

Toyo Seikan Co., Ltd.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.