PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Toyo Tanso Co., Ltd.

東洋炭素株式会社

Industry:

Material Manufacturing

Capacity and generation

T&D area:

Shikoku

Technology:

Solar

Capacity:

19.998MW (DC)

Inverter:

-

Generation:

26.68GWh/year

Status and timeline

Status:

Upcoming

Disclosed:

May 26, 2025

COD:

2027/06 (expected)

Duration:

30

Additional details

  • TESS Engineering will build a solar power plant using 30,072 665W Aiko Energy panels on an unutilized land that is part of Toyo Tanso’s Takuma Division in Mitoyo City, Kagawa Prefecture

Image(s)

TESS Engineering Co., Ltd.'s other PPAs

Toyo Tanso Co., Ltd.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.