PPA overview

Contract model and parties

Model:

Virtual

Generator:

Mitsubishi Corporation

三菱商事株式会社

Offtaker:

Murata Manufacturing

株式会社村田製作所

Industry:

Precision Instrument

Capacity and generation

T&D area:

-

Technology:

Solar

Capacity:

70MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Upcoming

Disclosed:

June 24, 2022

COD:

By FY2025 (expected)

Duration:

Undisclosed

Additional details

  • This PPA’s renewable energy credits will be supplied to Murata Manufacturing from newly built solar power plants
  • The two parties aim to increase the generation up to 300GWh in the future

Mitsubishi Corporation's other PPAs

Murata Manufacturing's other PPAs