PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Shizen Energy Inc.

自然電力株式会社

Retailer:

Shizen Energy Inc.

自然電力株式会社

Offtaker:

DYNAX

株式会社ダイナックス

Industry:

Automotive

Capacity and generation

T&D area:

Hokkaido

Technology:

Solar

Capacity:

3.85MW (DC)

Inverter:

2.75MW (AC)

Generation:

4.3GWh/year

Status and timeline

Status:

Live

Disclosed:

October 26, 2022

COD:

October 1, 2023

Duration:

Undisclosed

Additional details

  • The power will be supplied to DYNAX’s Tomakomai Factory in Hokkaido using a private transmission line from a power plant built on a nearby 63,721-square-meter rented land
  • The power procured through this PPA is expected to account for approximately 12% of the factory’s consumption
  • Construction on the power plant started in November 2022

Image(s)

Shizen Energy Inc.'s other PPAs

DYNAX's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.