Model:
Physical (off-site)
Generator:
Clean Energy Connect, Inc.
株式会社クリーンエナジーコネクト
Offtaker:
Amazon
Industry:
Information Technology
T&D area:
Multiple
Technology:
Solar
Capacity:
70MW (DC)
Inverter:
38MW (AC)
Generation:
Status:
Live
*
Disclosed:
February 15, 2023
COD:
2025/03 (expected)
Duration:
Undisclosed