PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Zero Energy Company

株式会社ゼック

Retailer:

TEPCO Energy Partner

東京電力エナジーパートナー株式会社

Offtaker:

Pan Pacific International Holdings Corporation

株式会社パン・パシフィック・インターナショナルホールディングス

Industry:

Retail

Capacity and generation

T&D area:

-

Technology:

Solar

Capacity:

3.65MW (DC)

Inverter:

-

Generation:

4.19GWh/year

Status and timeline

Status:

Live

*

Disclosed:

November 13, 2023

COD:

2024/09 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • As part of this PPA, ZEC will develop four power plants, all expected to start operation in September 2024 (names tentative):
    • Tohada Power Plant in Higashiibaraki District, Ibaraki Prefecture (950kW)
    • Kamizawa Power Plant in Hokota City, Ibaraki Prefecture (950kW)
    • Nakadai Power Plant in Omitama City, Ibaraki Prefecture (850kW)
    • Ashizaki Power Plant in Hitachinaka City, Ibaraki Prefecture (900kW)
  • The power will be supplied to Pan Pacific International Holdings’ following four stores:
    • MEGA Don Quijote Misato Store in Misato City, Saitama Prefecture
    • Benibana Walk Okegawa Store in Okegawa City, Saitama Prefecture
    • Apita Utsunomiya Store in Utsunomiya City, Tochigi Prefecture
    • Apita Nagatsuta Store in Yokohama City, Kanagawa Prefecture
  • This PPA is expected to account for approximately 17% of the four stores’ consumption

Zero Energy Company's other PPAs

Pan Pacific International Holdings Corporation's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.