PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Chugoku Electric Power Co. ,Inc

中国電力株式会社

Retailer:

Chugoku Electric Power Co. ,Inc

中国電力株式会社

Offtaker:

Toyo Kohan

東洋鋼鈑株式会社

Industry:

Metal Manufacturing

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

64MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Upcoming

Disclosed:

January 22, 2024

COD:

By FY2030 (expected)

Duration:

Undisclosed

Additional details

  • In partnership with Eco Style and Sai no Sakaki, Chugoku EPCO will develop an agrisolar power plant from which power will be supplied to Toyo Kohan Kudamatsu Factory in Kudamatsu City, Yamaguchi Prefecture
  • Toyo Kohan expects 20% of the factory’s power consumption to be from renewables with additionality by FY2030
  • This is the first agrisolar off-site PPA signed in the Chugoku T&D area

Chugoku Electric Power Co. ,Inc's other PPAs

Toyo Kohan's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.